# AppController Concurrency Test Implementation Plan > **For agentic workers:** REQUIRED SUB-SKILL: Use superpowers:subagent-driven-development (recommended) or superpowers:executing-plans to implement this plan task-by-task. Steps use checkbox (`- [ ]`) syntax for tracking. **Goal:** Add repeatable 32-thread unit concurrency tests for the singleton `AppController` without live infrastructure. **Architecture:** Create one standalone JUnit 5 test class with a shared controller instance and mocked collaborators. A fixed thread pool, ready latch, start latch, and bounded `Future#get` synchronize each test; concurrent collections retain observations for deterministic assertions after workers finish. **Tech Stack:** Java 17, JUnit 5, Mockito, AssertJ, Spring `MockMultipartFile`, Maven Surefire. ## Global Constraints - Do not modify production code unless a concurrency failure is reproduced. - Use exactly 32 worker threads per test. - Do not connect to MySQL, Redis, MQTT, or OSS. - Every future must have a bounded timeout. - Use one shared `AppController` instance within each test. --- ### Task 1: Add AppController Concurrency Coverage **Files:** - Create: `water-modules/water-app/src/test/java/org/dromara/app/controller/AppControllerConcurrencyTest.java` **Interfaces:** - Consumes: `AppController.switchDevice(String)`, `uploadImage(MultipartFile)`, and `editScheduleStatus(AppScheduleBo)`. - Produces: three repeatable JUnit concurrency tests and shared executor helpers. - [ ] **Step 1: Create the concurrency test fixture** Add Mockito mocks for all constructor dependencies, construct one controller per test, register an `ObjectMapper` in a `GenericApplicationContext`, and add a helper that submits 32 workers behind ready/start latches. - [ ] **Step 2: Add concurrent timestamp formatting test** Run 32 workers with 100 calls each. Capture every `startTime`, require 3,200 successful responses and invocations, and parse every captured value with strict `yyyy-MM-dd HH:mm:ss` formatting. - [ ] **Step 3: Add concurrent image validation test** Run 32 workers with 50 uploads each, cycling through JPEG, PNG, GIF, WebP, and BMP signatures. Require 1,600 successful responses and OSS calls. - [ ] **Step 4: Add concurrent schedule payload isolation test** Run 32 workers with 20 unique schedules each. Scope `LoginHelper.getUserId()` to each worker, generate a unique device and detail marker per schedule, capture MQTT payloads in a `ConcurrentHashMap`, and verify all 640 payloads contain their matching values. - [ ] **Step 5: Run the focused concurrency test** ```powershell mvn -pl water-modules/water-app -am "-DskipTests=false" "-Dmaven.test.skip=false" "-Dprofiles.active=dev" "-Dtest=AppControllerConcurrencyTest" "-Dsurefire.failIfNoSpecifiedTests=false" test ``` Expected: 3 tests pass with zero failures, errors, and timeouts. - [ ] **Step 6: Run the full water-app suite and diff checks** ```powershell mvn -pl water-modules/water-app -am "-DskipTests=false" "-Dmaven.test.skip=false" "-Dprofiles.active=dev" test git diff --check ``` Expected: reactor `BUILD SUCCESS`; all tests pass; `git diff --check` exits 0.